AP-INTRO-2026 · 2 pages
Alta Padel Introduction
The five courts, what we do around them, and the full document set with its reference codes. The two-page leave-behind.
Reference library
Ask for any of these and we will send it the same day.
The open documents introduce the range and what can be done with it. The rest go out against a name and an email, because they are the ones a real project needs — full specification, foundations, program and maintenance — and we would rather know who is building what. Nothing is withheld; everything here is available the same day.
Open
No form, no email address. These five introduce the range, what a court can be made to look like, and how the lighting performs.
AP-INTRO-2026 · 2 pages
The five courts, what we do around them, and the full document set with its reference codes. The two-page leave-behind.
AP-RANGE-2026 · REV 3 · 10 pages
The four permanent models side by side, and the Event Court — with the specification for each and the engineering notes behind them.
AP-BRAND-2026 · REV 2 · 10 pages
Every surface that can carry your identity, what each method costs in lead time, and the artwork we need to specify it.
AP-LIGHT-2026 · 12 pages
Photometrics for both systems, and glare from the court next door on a multi-court site.
AP-EVENT-2026 · REV 1 · 8 pages
Event Court — rent or buy. A regulation court built to travel: how it is built, where it works, the rental packages and what the site needs.
On request
One form, at the foot of this page, and you can request up to three documents at once. Choosing one here takes you straight to it with that document already ticked. Each title links to the page that explains it, if you would rather read the summary first.
AP-SPEC-2026 · 17 pages
Full specification, foundations, lighting design, general arrangement and the factory assembly drawings for the Panoramic court.
AP-GW-2026 · 16 pages
Slab, ring beam, drainage, tolerances and the pre-installation checklist — written to be used on site by the concrete subcontractor.
AP-INST-2026 · 12 pages
Order to opening day, week by week, with the site-readiness criteria and the responsibility matrix.
AP-CONV-2026 · 11 pages
What actually fits, what you can reuse, what it does to your membership, and the numbers to run before the board votes.
AP-SVC-2026 · 14 pages
What needs doing and who does it across the service year — the club routine, our visits, and the troubleshooting table.
AP-CON-2026 · 14 pages
Feasibility through launch, stage by stage, with the deliverable from each and how an engagement is structured.
AP-WAR-2026 · 10 pages
What is covered and for how long, the exclusions in full, what keeps cover valid, and how a claim works.
On request
Engineering documents for contractors and engineers, one set per model plus groundworks and lighting. Requested with the same form as the documents above; the download needs an access code. No code yet? Send the request and we will email one to you.
C-series · 7 pages
C-series · 7 pages
C-series · 7 pages
G-series · 7 pages
LT-series · 7 pages
LT-series · 9 pages
110, 130 and 150 mph models built to order; wind calculations with the order.
Request a document
Pick up to three, tell us who you are, and the download starts as soon as you submit.
Or send us a message if you are not sure which you need.